Carroll Painting · Colorado Springs, CO

Turnover Painting Checklist for Colorado Springs Managers

Turn a move-out walkthrough into a work order, with rooms and surfaces by name, access dates and a decision owner.

Send a Property Estimate Request

Family-owned in Colorado Springs since 1988

What should a turnover painting work order include?

Record the vacancy and move-in dates, authorized access, room and surface list, existing condition and who approves extra work. Separate ordinary paint wear from repairs and recurring moisture. Confirm when painting, locks, flooring, cleaning and inspection can happen.

Room-by-room scope

Distinguish walls, ceilings, doors, trim and closets. Flag marks that may merit touch-up versus a whole-wall repaint.

Repairs and exclusions

Record holes, texture, old patches and stains. Route active moisture or other material problems for appropriate evaluation.

Trade and access handoff

Identify who releases the unit and who signs off when work is done. Use established secure access practices.

Close out the vacancy with a clear record

Use one worksheet per unit. Identify the site or unit without putting resident information into the paint checklist.

  • Document the vacant unit. Take wide and detail photos, list included surfaces and note old product information.
  • Confirm what can start. Agree who grants access, which areas are released and where other trades affect the order of work.
  • Save the finish record. Keep the product, colors, included surfaces and approved extras for the next turnover.

The Carroll family

Let the next person work from the same facts

Carroll’s way of teaching the craft includes explaining why a surface was treated as it was. A well-kept turnover record brings the same clarity to the next property manager, trade and move-in.

Read the Carroll family story

Questions homeowners ask

Should I share lock combinations in the first inquiry?

Use your established access process after confirming the visit. The initial estimate can use a property reference and scope.

Can paint and cleaning happen on the same day?

Discuss practical sequencing, drying and access at the project level.

Does an estimate include every visible wall or repair?

The written scope should name the included surfaces and work. Ask about exclusions before approving it.

Further reading: Carroll’s rental turnover and access guidance · Carroll’s property planning and phasing guidance

Property Manager Turnover Painting Checklist

Fill in the details below or print a blank copy. Use your browser’s print dialog to choose a printer or Save as PDF.

Discuss Your Turnover Work Order

Share the vacancy window, surfaces and approval route. Keep tenant information and access codes out of the first request.

Send a Property Estimate Request